Photo Gallery
The proposed design includes a two-way bike connection on the Fir ramp:
(1) to provide a safe and relatively flat connection with the 10th Ave bike route;
(2) retaining existing sidewalks;
(3) generally retaining two lanes for motor vehicle traffic on the ramp; and
(4) including safety enhancements at 8th Ave, Broadway, and 10th Ave intersections.