Hastings-Sunrise (Adanac Overpass) traffic calming

Share Hastings-Sunrise (Adanac Overpass) traffic calming on Facebook Share Hastings-Sunrise (Adanac Overpass) traffic calming on Twitter Share Hastings-Sunrise (Adanac Overpass) traffic calming on Linkedin Email Hastings-Sunrise (Adanac Overpass) traffic calming link
Photo of people driving and cycling along Adanac St

繁體中文 | 简体中文 | Tiếng Việt

What’s happening?

We’re working to implement quick-build traffic calming measures in the Hastings-Sunrise (Adanac Overpass) neighbourhood as part of the Neighbourhood Traffic Management Program.

These quick-build traffic calming measures will help address higher than desirable vehicle volumes and speeds in the neighbourhood. We are also planning an upgrade to Adanac St. to make it safer for people walking, cycling and driving.

Background:

This project engaged the community in assessing and implementing on-street changes to help address neighbourhood traffic and improve safety for all.

Next steps

Thank you to everyone who participated in our final phase of engagement. Staff have reviewed community feedback and have refined the neighbourhood traffic calming implementation plan (PDF, 7.2 MB). Traffic calming measures will begin implementation in fall 2024.

繁體中文 | 简体中文 | Tiếng Việt

What’s happening?

We’re working to implement quick-build traffic calming measures in the Hastings-Sunrise (Adanac Overpass) neighbourhood as part of the Neighbourhood Traffic Management Program.

These quick-build traffic calming measures will help address higher than desirable vehicle volumes and speeds in the neighbourhood. We are also planning an upgrade to Adanac St. to make it safer for people walking, cycling and driving.

Background:

This project engaged the community in assessing and implementing on-street changes to help address neighbourhood traffic and improve safety for all.

Next steps

Thank you to everyone who participated in our final phase of engagement. Staff have reviewed community feedback and have refined the neighbourhood traffic calming implementation plan (PDF, 7.2 MB). Traffic calming measures will begin implementation in fall 2024.

  • CLOSED: This survey has concluded.

    This survey will be open until Friday, September 29, 2023 and should take approximately 20 minutes to complete.

    Paper copies are available upon request by emailing adanac-overpass@vancouver.ca or calling 311 and can be submitted by mail to the below address (postage included):

    Community Transportation Branch

    City of Vancouver, Engineering Services

    320-507 West Broadway

    Vancouver, British Columbia V5Z 0B4 Canada

    Share Hastings-Sunrise (Adanac Overpass) traffic calming survey - phase 2 engagement on Facebook Share Hastings-Sunrise (Adanac Overpass) traffic calming survey - phase 2 engagement on Twitter Share Hastings-Sunrise (Adanac Overpass) traffic calming survey - phase 2 engagement on Linkedin Email Hastings-Sunrise (Adanac Overpass) traffic calming survey - phase 2 engagement link
  • CLOSED: This survey has concluded.

    This survey will be open until Friday, April 28 and should take approximately 20 minutes to complete.

    Paper copies are available upon request by emailing adanac-overpass@vancouver.ca or calling 311 and can be submitted by mail to this address (postage included):

    Community Transportation Branch

    City of Vancouver, Engineering Services

    320-507 West Broadway

    Vancouver, British Columbia V5Z 0B4 Canada

    Share Hastings-Sunrise Adanac Overpass area traffic calming survey on Facebook Share Hastings-Sunrise Adanac Overpass area traffic calming survey on Twitter Share Hastings-Sunrise Adanac Overpass area traffic calming survey on Linkedin Email Hastings-Sunrise Adanac Overpass area traffic calming survey link
Page last updated: 09 Sep 2024, 02:35 PM