904-920 Davie St rezoning application

Share 904-920 Davie St rezoning application on Facebook Share 904-920 Davie St rezoning application on Twitter Share 904-920 Davie St rezoning application on Linkedin Email 904-920 Davie St rezoning application link

The City of Vancouver has received an application to rezone the subject site from DD (Downtown) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 29-storey mixed-use building and includes:

  • 179 strata residential units;
  • 3,410 sq. m (36,708 sq. ft.) of office use;
  • Commercial space on the ground floor;
  • A floor space ratio (FSR) of 12.91; and
  • A building height of 106.1 m (348 ft.).

This application is being considered under the Downtown Official Development Plan and the Potential "Benefit Capacity” in Downtown Policy.

Updated Materials (Jun 27, 2024)

Updated shadow studies were submitted following staff review. The updates were made to correct shadow studies to account for daylight savings time. The updates do not include changes to the proposed building itself.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The City of Vancouver has received an application to rezone the subject site from DD (Downtown) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 29-storey mixed-use building and includes:

  • 179 strata residential units;
  • 3,410 sq. m (36,708 sq. ft.) of office use;
  • Commercial space on the ground floor;
  • A floor space ratio (FSR) of 12.91; and
  • A building height of 106.1 m (348 ft.).

This application is being considered under the Downtown Official Development Plan and the Potential "Benefit Capacity” in Downtown Policy.

Updated Materials (Jun 27, 2024)

Updated shadow studies were submitted following staff review. The updates were made to correct shadow studies to account for daylight savings time. The updates do not include changes to the proposed building itself.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

Page last updated: 14 Aug 2024, 09:56 AM