We're planning to improve active transportation along Smithe Street (Richards Street to Thurlow Street).

The proposed upgrades will:

  1. Close major gaps in the existing bike network by providing an east-west connection between the West End and Cambie Bridge.
  2. Create safer intersections for everybody through protected intersections.
  3. Be delivered using a quick-build approach to minimize impacts.
  4. Maintain sufficient vehicle capacity for pre-COVID volumes.



Engagement Feedback

  • In spring 2021, we engaged with stakeholders and public to gather feedback on a proposed design for Smithe Street upgrades.
  • Thank you to everyone who provided feedback. We have refined the design based on what we heard to improve safety and comfort for all road users.
  • View the detailed stakeholder and public engagement summary.

We're planning to improve active transportation along Smithe Street (Richards Street to Thurlow Street).

The proposed upgrades will:

  1. Close major gaps in the existing bike network by providing an east-west connection between the West End and Cambie Bridge.
  2. Create safer intersections for everybody through protected intersections.
  3. Be delivered using a quick-build approach to minimize impacts.
  4. Maintain sufficient vehicle capacity for pre-COVID volumes.



Engagement Feedback

  • In spring 2021, we engaged with stakeholders and public to gather feedback on a proposed design for Smithe Street upgrades.
  • Thank you to everyone who provided feedback. We have refined the design based on what we heard to improve safety and comfort for all road users.
  • View the detailed stakeholder and public engagement summary.
  • CLOSED: This survey has concluded.

    The survey is now closed. Thank you to everyone who participated and shared their feedback.