October 27 2023

Application received

February 07 → February 20 2024

Q&A period

March 13 2024

Urban Design Panel

This application was reviewed by the Urban Design panel with the outcome of Support (5/0). Please see the Urban Design Panel page for meeting minutes and agendas.

July 09 2024

Referral to Public Hearing

September 24 2024

Public Hearing