722 Gore Avenue (Temporary Firehall Annex) rezoning application

Share 722 Gore Avenue (Temporary Firehall Annex) rezoning application on Facebook Share 722 Gore Avenue (Temporary Firehall Annex) rezoning application on Twitter Share 722 Gore Avenue (Temporary Firehall Annex) rezoning application on Linkedin Email 722 Gore Avenue (Temporary Firehall Annex) rezoning application link

The City of Vancouver has received an application to rezone road reserve land currently zoned CD-1 (41D) (Comprehensive Development) District to a new CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a temporary annex for firehall #2 on the north portion of the site and includes:

  • The installation of two temporary structures;
  • Two fire truck bays;
  • A total floor area of 449 sq. m (4,832 sq. ft.); and
  • A maximum height of 8.15 m (27 ft.).

This application is being considered under the Downtown Eastside Plan.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.


Announcements

May 24, 2024

Arborist report has been posted.

---

July 12, 2024

Neighbourhood fit evaluation form and Transportation assessment and management study (TAMS) have been posted.

---

July 16, 2024

Public consultation summary has been posted.

The City of Vancouver has received an application to rezone road reserve land currently zoned CD-1 (41D) (Comprehensive Development) District to a new CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a temporary annex for firehall #2 on the north portion of the site and includes:

  • The installation of two temporary structures;
  • Two fire truck bays;
  • A total floor area of 449 sq. m (4,832 sq. ft.); and
  • A maximum height of 8.15 m (27 ft.).

This application is being considered under the Downtown Eastside Plan.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.


Announcements

May 24, 2024

Arborist report has been posted.

---

July 12, 2024

Neighbourhood fit evaluation form and Transportation assessment and management study (TAMS) have been posted.

---

July 16, 2024

Public consultation summary has been posted.

Page last updated: 17 Jul 2024, 08:27 AM