461-479 E 16th Ave rezoning application
The City of Vancouver has received an application to rezone the subject site from RM-4N (Residential) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 20-storey mixed-use building and includes:
- 171 secured rental units with 20% of the floor area secured for below-market rental units;
- Commercial space on the ground floor;
- A floor space ratio (FSR) of 6.8; and
- A building height of 72.6 m (238 ft.).
This application is being considered under the Broadway Plan.
Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.
Announcements
May 24, 2024
This site is located in a Groundwater Area of Concern and a peat area. As such, a preliminary geotechnical and hydrogeological investigation report was required to be submitted for the rezoning application which has now been published on this page. Engineering staff note that the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions, which will be required to be further developed and elaborated at the development permit stage, should the rezoning be approved.
May 31, 2024
Preliminary Hydrogeological study has been reposted including Appendix A and B.
The City of Vancouver has received an application to rezone the subject site from RM-4N (Residential) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 20-storey mixed-use building and includes:
- 171 secured rental units with 20% of the floor area secured for below-market rental units;
- Commercial space on the ground floor;
- A floor space ratio (FSR) of 6.8; and
- A building height of 72.6 m (238 ft.).
This application is being considered under the Broadway Plan.
Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.
Announcements
May 24, 2024
This site is located in a Groundwater Area of Concern and a peat area. As such, a preliminary geotechnical and hydrogeological investigation report was required to be submitted for the rezoning application which has now been published on this page. Engineering staff note that the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions, which will be required to be further developed and elaborated at the development permit stage, should the rezoning be approved.
May 31, 2024
Preliminary Hydrogeological study has been reposted including Appendix A and B.
The opportunity to ask questions through the Q&A is available from May 29 to June 11, 2024.
We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.
Please note that the comment form will remain open after the Q&A period. The Rezoning Planner can also be contacted directly for any further feedback or questions.
-
Share I love the "neighbourhood bodega" concept. When will the developer begin discussions potential tenants? Any chance we could see a new restaurant added in this space? Would love to see more independent restaurants and coffee shops in the neighbourhood, which is part of what makes this area special. on Facebook Share I love the "neighbourhood bodega" concept. When will the developer begin discussions potential tenants? Any chance we could see a new restaurant added in this space? Would love to see more independent restaurants and coffee shops in the neighbourhood, which is part of what makes this area special. on Twitter Share I love the "neighbourhood bodega" concept. When will the developer begin discussions potential tenants? Any chance we could see a new restaurant added in this space? Would love to see more independent restaurants and coffee shops in the neighbourhood, which is part of what makes this area special. on Linkedin Email I love the "neighbourhood bodega" concept. When will the developer begin discussions potential tenants? Any chance we could see a new restaurant added in this space? Would love to see more independent restaurants and coffee shops in the neighbourhood, which is part of what makes this area special. link
I love the "neighbourhood bodega" concept. When will the developer begin discussions potential tenants? Any chance we could see a new restaurant added in this space? Would love to see more independent restaurants and coffee shops in the neighbourhood, which is part of what makes this area special.
G. Russ asked 5 months agoThank you for your question. This question has been forwarded to the applicant and this is their response: Our vision for the ‘bodega’ is a family-friendly café and corner store where residents in the broader community can come to get daily conveniences like coffee and pastries, as well as basic provisions. The intent is for it to become a social space within the neighbourhood, where people can meet each other and continue to build on the great community that exists in Mount Pleasant. It is too early for us to be speaking with potential operators, but we definitely see this as an independent tenant.
-
Share Does the city have a risk matrix they can provide which determines acceptable risk for these kinds of developments? For example, what consequence to neighboring properties (based on a development) in a 25 year span is deemed acceptable? Is it $10k, $1 million, larger? If the adjacent properties were found to not be built on piles, as per stated in the hydrogeological report, would this have an affect on the risk the city would be willing to accept for this proposed development? on Facebook Share Does the city have a risk matrix they can provide which determines acceptable risk for these kinds of developments? For example, what consequence to neighboring properties (based on a development) in a 25 year span is deemed acceptable? Is it $10k, $1 million, larger? If the adjacent properties were found to not be built on piles, as per stated in the hydrogeological report, would this have an affect on the risk the city would be willing to accept for this proposed development? on Twitter Share Does the city have a risk matrix they can provide which determines acceptable risk for these kinds of developments? For example, what consequence to neighboring properties (based on a development) in a 25 year span is deemed acceptable? Is it $10k, $1 million, larger? If the adjacent properties were found to not be built on piles, as per stated in the hydrogeological report, would this have an affect on the risk the city would be willing to accept for this proposed development? on Linkedin Email Does the city have a risk matrix they can provide which determines acceptable risk for these kinds of developments? For example, what consequence to neighboring properties (based on a development) in a 25 year span is deemed acceptable? Is it $10k, $1 million, larger? If the adjacent properties were found to not be built on piles, as per stated in the hydrogeological report, would this have an affect on the risk the city would be willing to accept for this proposed development? link
Does the city have a risk matrix they can provide which determines acceptable risk for these kinds of developments? For example, what consequence to neighboring properties (based on a development) in a 25 year span is deemed acceptable? Is it $10k, $1 million, larger? If the adjacent properties were found to not be built on piles, as per stated in the hydrogeological report, would this have an affect on the risk the city would be willing to accept for this proposed development?
A. Perry asked 5 months agoAll practicing professional engineers should evaluate risks as part of design development. This can be in a “risk matrix” form or similar. In this case, the applicant’s consultant must present possible consequences as a result of professional decisions. (Please see here how professional engineers are regulated)
Generally, the liability is with the developer and the City:
- The applicant’s consultant (professional engineers) must address both on-site and off-site risks to meet the building code requirements as well as Engineers and Geoscientists of BC requirements.
- The design solutions need to be to the satisfaction of the City – ultimately align with City code/requirements and address concerns, in particular any off-site impacts.
In general, the City uses risk management especially for City delivered capital projects. For developer delivered projects, it is a duty for them to also use a form of risk management.
-
Share Regarding this statement - "the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions" - this is problematic as a company hired by the developer is incentivized to provide them with a favourable report. Would the City consider engaging a truly independent company given the complications that this land presents? on Facebook Share Regarding this statement - "the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions" - this is problematic as a company hired by the developer is incentivized to provide them with a favourable report. Would the City consider engaging a truly independent company given the complications that this land presents? on Twitter Share Regarding this statement - "the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions" - this is problematic as a company hired by the developer is incentivized to provide them with a favourable report. Would the City consider engaging a truly independent company given the complications that this land presents? on Linkedin Email Regarding this statement - "the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions" - this is problematic as a company hired by the developer is incentivized to provide them with a favourable report. Would the City consider engaging a truly independent company given the complications that this land presents? link
Regarding this statement - "the applicant is responsible for engaging a qualified professional engineer or geoscientist to provide design and construction recommendations that ensure development will not result in negative offsite impacts as it relates to groundwater and soil conditions" - this is problematic as a company hired by the developer is incentivized to provide them with a favourable report. Would the City consider engaging a truly independent company given the complications that this land presents?
A.K. asked 5 months agoThe applicant’s consultant (professional engineers) must address both on-site and off-site risks to meet the building code requirements as well as Engineers and Geoscientists of BC requirements. You can learn more of their regulatory role on the website of Engineers and Geoscientist of BC. As a requirement of the Engineers and Geoscientists of BC, a professional engineer or geoscientist must clearly present possible consequences of professional decisions.
It is important to note that any project has also to meet building code requirements. For that, the professional engineers (the applicant’s consultants) are required to address both onsite and offsite risks. City can still put a hold on the project past the Development Permit to ensure methods are functioning as proposed. Further down the line, at the Building Permit stage, when the developer’s full design concept is completed, the City could also request that a third-party review for detailed design be performed at the expense of the developer, with the reviewing consultant to be approved by the City.
-
Share Would it be possible to have an explanation on how it’s determined which affected neighbours are notified of these types of applications? For something of this size and scope it would seem like more than a 2 block radius would be affected by this development and more care should have been taken to inform this community. Any help in understand how notification is determined is much appreciated. on Facebook Share Would it be possible to have an explanation on how it’s determined which affected neighbours are notified of these types of applications? For something of this size and scope it would seem like more than a 2 block radius would be affected by this development and more care should have been taken to inform this community. Any help in understand how notification is determined is much appreciated. on Twitter Share Would it be possible to have an explanation on how it’s determined which affected neighbours are notified of these types of applications? For something of this size and scope it would seem like more than a 2 block radius would be affected by this development and more care should have been taken to inform this community. Any help in understand how notification is determined is much appreciated. on Linkedin Email Would it be possible to have an explanation on how it’s determined which affected neighbours are notified of these types of applications? For something of this size and scope it would seem like more than a 2 block radius would be affected by this development and more care should have been taken to inform this community. Any help in understand how notification is determined is much appreciated. link
Would it be possible to have an explanation on how it’s determined which affected neighbours are notified of these types of applications? For something of this size and scope it would seem like more than a 2 block radius would be affected by this development and more care should have been taken to inform this community. Any help in understand how notification is determined is much appreciated.
Out of the Loop and Opposed asked 5 months agoDuring the application process, staff inform the community in a variety of ways. First, we always put up a site sign so that folks can visibly see the proposal in person. Second, we create an online application page to allow people to comment from anywhere. Finally, we circulate postcards with Canada Post. Further, during the Broadway Planning process, there were a number of events and engagement opportunities for which stakeholders were invited to participate.
Please also note that starting on June 13, you can share your feedback on Broadway Plan implementation projects at https://www.shapeyourcity.ca/broadway-plan and during in-person events listed on the website:
- Broadway Plan review: Updating and reviewing land use and built form policies to comply with new provincial legislative requirements for Transit-Oriented Areas (TOAs).
- City Hall Campus (Civic District): Creating a long-term plan for the City lands around Vancouver’s City Hall.
- Phase 2 of the Public Realm and Streetscape Plan: Planning improvements to the streets and public spaces in the area for the next 30 years.
-
Share The City's response asserts that the current application does not create an orphaned lot condition for the existing duplex because the corner lot has not yet been redeveloped through the Broadway Plan. However, the Broadway Plan does not stipulate that redevelopment must occur in the future under its provisions. The corner lot was redeveloped in 2014 and consists of new townhouses. Therefore, the proposed development directly to the east would be the development that orphans the duplex, not the other way around. Follow-Up Question: Given that the corner lot was already redeveloped in 2014 with new townhouses, which existed prior to the proposed development, how can the City justify the assertion that the current application does not create an orphaned lot condition for the existing duplex? Specifically, how does this comply with the Broadway Plan’s requirement that development proposals with lesser frontage must avoid precluding future opportunities and not leave behind isolated small lots that cannot be reasonably developed? Please refer to pages 70 and 71 of the Broadway Plan for clarification on these provisions. on Facebook Share The City's response asserts that the current application does not create an orphaned lot condition for the existing duplex because the corner lot has not yet been redeveloped through the Broadway Plan. However, the Broadway Plan does not stipulate that redevelopment must occur in the future under its provisions. The corner lot was redeveloped in 2014 and consists of new townhouses. Therefore, the proposed development directly to the east would be the development that orphans the duplex, not the other way around. Follow-Up Question: Given that the corner lot was already redeveloped in 2014 with new townhouses, which existed prior to the proposed development, how can the City justify the assertion that the current application does not create an orphaned lot condition for the existing duplex? Specifically, how does this comply with the Broadway Plan’s requirement that development proposals with lesser frontage must avoid precluding future opportunities and not leave behind isolated small lots that cannot be reasonably developed? Please refer to pages 70 and 71 of the Broadway Plan for clarification on these provisions. on Twitter Share The City's response asserts that the current application does not create an orphaned lot condition for the existing duplex because the corner lot has not yet been redeveloped through the Broadway Plan. However, the Broadway Plan does not stipulate that redevelopment must occur in the future under its provisions. The corner lot was redeveloped in 2014 and consists of new townhouses. Therefore, the proposed development directly to the east would be the development that orphans the duplex, not the other way around. Follow-Up Question: Given that the corner lot was already redeveloped in 2014 with new townhouses, which existed prior to the proposed development, how can the City justify the assertion that the current application does not create an orphaned lot condition for the existing duplex? Specifically, how does this comply with the Broadway Plan’s requirement that development proposals with lesser frontage must avoid precluding future opportunities and not leave behind isolated small lots that cannot be reasonably developed? Please refer to pages 70 and 71 of the Broadway Plan for clarification on these provisions. on Linkedin Email The City's response asserts that the current application does not create an orphaned lot condition for the existing duplex because the corner lot has not yet been redeveloped through the Broadway Plan. However, the Broadway Plan does not stipulate that redevelopment must occur in the future under its provisions. The corner lot was redeveloped in 2014 and consists of new townhouses. Therefore, the proposed development directly to the east would be the development that orphans the duplex, not the other way around. Follow-Up Question: Given that the corner lot was already redeveloped in 2014 with new townhouses, which existed prior to the proposed development, how can the City justify the assertion that the current application does not create an orphaned lot condition for the existing duplex? Specifically, how does this comply with the Broadway Plan’s requirement that development proposals with lesser frontage must avoid precluding future opportunities and not leave behind isolated small lots that cannot be reasonably developed? Please refer to pages 70 and 71 of the Broadway Plan for clarification on these provisions. link
The City's response asserts that the current application does not create an orphaned lot condition for the existing duplex because the corner lot has not yet been redeveloped through the Broadway Plan. However, the Broadway Plan does not stipulate that redevelopment must occur in the future under its provisions. The corner lot was redeveloped in 2014 and consists of new townhouses. Therefore, the proposed development directly to the east would be the development that orphans the duplex, not the other way around. Follow-Up Question: Given that the corner lot was already redeveloped in 2014 with new townhouses, which existed prior to the proposed development, how can the City justify the assertion that the current application does not create an orphaned lot condition for the existing duplex? Specifically, how does this comply with the Broadway Plan’s requirement that development proposals with lesser frontage must avoid precluding future opportunities and not leave behind isolated small lots that cannot be reasonably developed? Please refer to pages 70 and 71 of the Broadway Plan for clarification on these provisions.
whirlwhind asked 5 months agoWhile the Broadway Plan does say that new developments should not unreasonably limit development on adjacent sites, that does not imply that every site must be able to accommodate a tower. The existing zoning (RM-4) as well as the Broadway Plan include development options for smaller lots.
While the site does not comply with the minimum site frontage for consideration as a tower development; given that this site has approximately 40.2 m (132 ft.) frontage, a tower form may be considered. The Broadway Plan allows for proposals with lesser frontages at the discretion of the Director of Planning, where the proposal meets the following criteria: the proposal complies with all other sections of the Broadway Plan governing built form and site design and the site frontage must not be less than 30.2 m (99 ft.). The applicant also has to demonstrate that the development reasonably mitigates development limitations on adjacent properties. Please refer to Chapter 7 of the Plan, specifically pages 70-71 where it clarifies the Tower Site Frontage Requirements.
Both of these issues will also be part of staff’s review of the project which is currently underway.
-
Share What are you planning to do with the traffic on east 16th. It is already so congested. This 20 storey building is going to change this neighbourhood and not in a good way. One of the reasons we bought here is because of the houses and townhouses and now you are planning to put a tower in the middle. Not to mention a tower in this location will strain the already inadequate infrastructure. Will you be sending more than one engineering report? on Facebook Share What are you planning to do with the traffic on east 16th. It is already so congested. This 20 storey building is going to change this neighbourhood and not in a good way. One of the reasons we bought here is because of the houses and townhouses and now you are planning to put a tower in the middle. Not to mention a tower in this location will strain the already inadequate infrastructure. Will you be sending more than one engineering report? on Twitter Share What are you planning to do with the traffic on east 16th. It is already so congested. This 20 storey building is going to change this neighbourhood and not in a good way. One of the reasons we bought here is because of the houses and townhouses and now you are planning to put a tower in the middle. Not to mention a tower in this location will strain the already inadequate infrastructure. Will you be sending more than one engineering report? on Linkedin Email What are you planning to do with the traffic on east 16th. It is already so congested. This 20 storey building is going to change this neighbourhood and not in a good way. One of the reasons we bought here is because of the houses and townhouses and now you are planning to put a tower in the middle. Not to mention a tower in this location will strain the already inadequate infrastructure. Will you be sending more than one engineering report? link
What are you planning to do with the traffic on east 16th. It is already so congested. This 20 storey building is going to change this neighbourhood and not in a good way. One of the reasons we bought here is because of the houses and townhouses and now you are planning to put a tower in the middle. Not to mention a tower in this location will strain the already inadequate infrastructure. Will you be sending more than one engineering report?
shellinatarmohamed asked 5 months agoThank you for your question: The proposed development complies with the Parking By-law with respect to off-street vehicle parking spaces and is well-sited to encourage reduced vehicle trip and parking demand. It is in close proximity to the frequent transit network along Kingsway Avenue and cycling infrastructure along Prince Edward Street. A Transportation Demand Management (TDM) Plan has also been submitted by the applicant proposing a variety of sustainable transportation strategies to reduce the demand for vehicle use. which helps to further reduce development demand for vehicle trips and parking.
As part of the rezoning process, the application is reviewed with respect to access and transportation impacts. Following review, development conditions for off-site infrastructure may be required, such as improved public realm, sidewalks, and intersection upgrades, to improve transportation operations and safety for pedestrians, cyclists, and motorists alike near the site.
-
Share I oppose - this will ruin the neighborhood and the groundwater will create instability for neighbouring buildings on Facebook Share I oppose - this will ruin the neighborhood and the groundwater will create instability for neighbouring buildings on Twitter Share I oppose - this will ruin the neighborhood and the groundwater will create instability for neighbouring buildings on Linkedin Email I oppose - this will ruin the neighborhood and the groundwater will create instability for neighbouring buildings link
I oppose - this will ruin the neighborhood and the groundwater will create instability for neighbouring buildings
Sarah asked 5 months agoThank you for your comment. Staff will include a summary of comments provided from the public in a Council report if the project proceeds for Council consideration.
-
Share How will the surrounding infrastructure be changed to accommodate so many new residents? The area’s schools and childcare facilities, for example, are already oversaturated with the current demand. on Facebook Share How will the surrounding infrastructure be changed to accommodate so many new residents? The area’s schools and childcare facilities, for example, are already oversaturated with the current demand. on Twitter Share How will the surrounding infrastructure be changed to accommodate so many new residents? The area’s schools and childcare facilities, for example, are already oversaturated with the current demand. on Linkedin Email How will the surrounding infrastructure be changed to accommodate so many new residents? The area’s schools and childcare facilities, for example, are already oversaturated with the current demand. link
How will the surrounding infrastructure be changed to accommodate so many new residents? The area’s schools and childcare facilities, for example, are already oversaturated with the current demand.
SSH asked 5 months agoThank you for your question, which has been asked before, here is a copy of what we responded:
Childcare
Childcare is an essential service that supports children, parents and families. Anticipated population growth in the Broadway Plan area will add to existing demands for childcare. While childcare is primarily a responsibility of the provincial government, the City is well positioned to support alignment with universal childcare goals by leveraging City tools and new development to help create childcare facilities. This is alongside the City’s ongoing priority to work with public and non-profit partners to increase equitable access to childcare, particularly for children younger than school age (see section 16.1, p. 420-422 for detailed policies). Generally, amenities and infrastructure, such as childcare facilities, parks, community centres, libraries, cultural facilities, affordable housing, utility upgrades (water and sewer), and street improvements, are funded from a variety of sources (see chapter for Public Benefits Strategy in the Broadway Plan for details).
Development Cost Levies (DCLs) fund specifically designated service areas, including parks, childcare, social housing and engineering infrastructure. CACs are generally restricted to capital investments within the community areas where they were generated with the intention that they will serve the related population growth. The federal and provincial governments hold mandates to deliver childcare and social housing. For these services, the City works in partnership with senior governments to ensure that spending is coordinated and opportunities for delivery are maximized. These partnerships will be necessary to achieve the objectives of the Broadway Plan PBS. Please also see section 21.2 of the Broadway Plan (p. 475/76).
The Broadway Plan also includes a the following policy in some of the subareas, including the one where the project site is located: ”Minor increases in height and density will be considered for delivery of local-serving retail/service uses or childcare.” (p. 251 of the Plan)
In 2022, City Council also adopted a new 10-year childcare strategy (Making Strides: Vancouver’s Childcare Strategy) to plan for expanded childcare access as an essential component of the health and well-being of children and families. For more information about the Strategy, please visit the following link: Vancouver's childcare approach.
Schools
Staff are in regular contact with the Vancouver School Board (VSB) to align City planning directions with VSB school capacity and long-range facilities planning. The preparation of the Broadway Plan has included engagement with the VSB to understand future school aged population and school capacity requirements over the 30-year horizon of the Plan. However, it is the provincial government that is responsible for delivering schools, so school funding is not included in the Public Benefits Strategy for the Broadway Plan. However, the City plays an important role in liaising with the VSB on the provision of schools, ensuring that they are aware of, and planning for, the additional needs that will be generated as a result of population and job growth. It is anticipated that growth in the area would result in new elementary and secondary school students. Some of that growth will be able to be accommodated through expansions to existing schools, and the VSB has already made funding requests to expand Cavell, Hudson, and False Creek elementary schools, as well as a new school in Olympic Village. Eventually, it is anticipated that an additional elementary school will be required. The City will continue to work with VSB to investigate and action opportunities for a new school site in or near the Broadway Plan area, but it will be funded through provincial funding mechanisms. The prioritization and timing of funding approval for school expansion and upgrades is at the discretion of the Ministry of Education. Through plan implementation the City continues to work with the Vancouver School Board to help inform capital requests to the Ministry of Education.
VSB has forecasts on school capacity utilization in their Long Range Facilities Plan which shows that enrollment in schools is declining. The downward enrollment trend is predicted to continue for the school district overall, but will vary significantly in different catchment areas. Overall, capacity is expected to be available over the long term.
- The site is located within the catchment area of Florence Nightingale Elementary School and Sir Charles Tupper Secondary School as well as French Immersion Laura Secord Elementary and Vancouver Tech Secondary.
- According to the Vancouver School Board (VSB)’s 2020 Long Range Facilities Plan, Dr. Florence Nightingale Elementary is currently operating at 76% capacity and by 2031 is forecasted to be operating at 77% capacity. Laura Secord Elementary is currently operating at 103% capacity and by 2031 is forecasted to be operating at 94% capacity
- Sir Charles Tupper Secondary is operating at 75% with an expected capacity of 67% by 2031. Vancouver Technical Secondary is operating at 94% capacity and by 2031 is forecasted to be operating at 78% capacity.
- The VSB report notes that overall enrolment trends for the wider area are changing. The VSB continues to explore options to reduce pressure on schools in this area, monitor development, and work with City staff to help plan for future growth.
Please feel free to also share your general concerns about school capacity with Council and the Vancouver School Board: -
Share Assuming this is approved, when will this building get occupancy? Is there a waitlist for the homes? I am interested in this building. on Facebook Share Assuming this is approved, when will this building get occupancy? Is there a waitlist for the homes? I am interested in this building. on Twitter Share Assuming this is approved, when will this building get occupancy? Is there a waitlist for the homes? I am interested in this building. on Linkedin Email Assuming this is approved, when will this building get occupancy? Is there a waitlist for the homes? I am interested in this building. link
Assuming this is approved, when will this building get occupancy? Is there a waitlist for the homes? I am interested in this building.
AEA asked 5 months agoThank you for your question. This question has been forwarded to the applicant and this is their response: Assuming this project will be approved by Council, we might be ready to welcome new residents by the end of 2028 or early 2029. A significant purpose-built rental project such as this takes quite some time to design, receive permits, finance and construct. We would not begin collecting applications or begin any form of waitlist process until approximately 6 months from completion.
-
Share Do you have any examples of other building projects such as this one; 20+ storeys with 4 Levels of underground parkade, perhaps with less frontage than required and not having the required 4 storey podium) that were successfully built on similar soil conditions without significant damage to neighboring properties? on Facebook Share Do you have any examples of other building projects such as this one; 20+ storeys with 4 Levels of underground parkade, perhaps with less frontage than required and not having the required 4 storey podium) that were successfully built on similar soil conditions without significant damage to neighboring properties? on Twitter Share Do you have any examples of other building projects such as this one; 20+ storeys with 4 Levels of underground parkade, perhaps with less frontage than required and not having the required 4 storey podium) that were successfully built on similar soil conditions without significant damage to neighboring properties? on Linkedin Email Do you have any examples of other building projects such as this one; 20+ storeys with 4 Levels of underground parkade, perhaps with less frontage than required and not having the required 4 storey podium) that were successfully built on similar soil conditions without significant damage to neighboring properties? link
Do you have any examples of other building projects such as this one; 20+ storeys with 4 Levels of underground parkade, perhaps with less frontage than required and not having the required 4 storey podium) that were successfully built on similar soil conditions without significant damage to neighboring properties?
Mark Siller asked 6 months agoThanks for your question. As mentioned earlier, City staff currently conducts a thorough site-specific analysis that enables them to take into account the specific circumstances and conditions and will make their recommendation after that.
Key dates
-
April 04 2024
-
May 29 → June 11 2024
Location
Application documents
Applicable plans and policies
Contact applicant
-
Phone 604-377-3802 Email info@fabriceast16.com
Contact us
-
Phone 604-326-4844 Email Susanne.Ruhle@vancouver.ca