Share 15-27 W Hastings rezoning application on FacebookShare 15-27 W Hastings rezoning application on TwitterShare 15-27 W Hastings rezoning application on LinkedinEmail 15-27 W Hastings rezoning application link
The City of Vancouver has received an application to rezone the subject site from DD (Downtown) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 40-storey mixed-use rental building and includes:
441 market rental units;
108 below-market rental units operated by a non-profit operator;
Commercial space on the ground floor;
A floor space ratio (FSR) of 22.28; and
A building height of 117 m (384 ft.).
The Samuel Tower is located in the Victory Square sub area of the Downtown Eastside Plan. The proposal requests consideration of height in excess of the existing policy. The Victory Square sub-area allows a maximum height of 32 m (105 ft.).
This application is being processed and reviewed concurrently with the application to rezone 8-36 W Cordova St.
Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.
The City of Vancouver has received an application to rezone the subject site from DD (Downtown) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 40-storey mixed-use rental building and includes:
441 market rental units;
108 below-market rental units operated by a non-profit operator;
Commercial space on the ground floor;
A floor space ratio (FSR) of 22.28; and
A building height of 117 m (384 ft.).
The Samuel Tower is located in the Victory Square sub area of the Downtown Eastside Plan. The proposal requests consideration of height in excess of the existing policy. The Victory Square sub-area allows a maximum height of 32 m (105 ft.).
This application is being processed and reviewed concurrently with the application to rezone 8-36 W Cordova St.
Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.