351 W 16th Ave (DP-2024-00229) development application

Share 351 W 16th Ave (DP-2024-00229) development application on Facebook Share 351 W 16th Ave (DP-2024-00229) development application on Twitter Share 351 W 16th Ave (DP-2024-00229) development application on Linkedin Email 351 W 16th Ave (DP-2024-00229) development application link

The Director of Planning approved the application on October 3, 2024, subject to conditions.  A Development Permit may be issued once all conditions have been satisfied. For more information please see the Prior-to letter under "Application documents"



Haeccity Studio Architecture has applied to the City of Vancouver for permission to develop two multiple dwelling buildings on this site, including a front four-storey stacked townhouse and a rear three-storey apartment building on this site, consisting of approximately:


  • 13 total secured market rental dwelling units
  • Total Site Floor Space Ratio of 1.42 FSR (approximately 850 m² / 9,147 sq.ft.)
  • Maximum Building Height of 11.52 m (37.8 ft.) to top of front building roof peak
  • Four parking stalls having vehicular access from the rear lane

Under the site’s proposed CD-1 rezoning to be approved by Council, the application is “conditional” and may be permitted pending review. However, it requires the decision of the Director of Planning.


Haeccity Studio Architecture has applied to the City of Vancouver for permission to develop two multiple dwelling buildings on this site, including a front four-storey stacked townhouse and a rear three-storey apartment building on this site, consisting of approximately:


  • 13 total secured market rental dwelling units
  • Total Site Floor Space Ratio of 1.42 FSR (approximately 850 m² / 9,147 sq.ft.)
  • Maximum Building Height of 11.52 m (37.8 ft.) to top of front building roof peak
  • Four parking stalls having vehicular access from the rear lane

Under the site’s proposed CD-1 rezoning to be approved by Council, the application is “conditional” and may be permitted pending review. However, it requires the decision of the Director of Planning.