2841 E Hastings St (DP-2021-00591) development application

Share on Facebook Share on Twitter Share on Linkedin Email this link

The Director of Planning approved this application, and a Development Permit was issued on January 18, 2022.


Jeff Henderson Construction Ltd. has applied to the City of Vancouver for permission to develop the following on this site:

  • To change the use of approximately 340.8 m² (3668 sq. ft.) from a retail store to a Fitness Studio - Class 2 in this existing six-storey mixed-use building

Under the site’s existing CD-1 (647) zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Jeff Henderson Construction Ltd. has applied to the City of Vancouver for permission to develop the following on this site:

  • To change the use of approximately 340.8 m² (3668 sq. ft.) from a retail store to a Fitness Studio - Class 2 in this existing six-storey mixed-use building

Under the site’s existing CD-1 (647) zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.