1030-1070 E Hastings St rezoning application

Share 1030-1070 E Hastings St rezoning application on Facebook Share 1030-1070 E Hastings St rezoning application on Twitter Share 1030-1070 E Hastings St rezoning application on Linkedin Email 1030-1070 E Hastings St rezoning application link

The City of Vancouver has received an application to rezone the subject site from M-1 (Industrial) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 38-storey mixed-use building and includes:

  • 382 rental residential units;
  • Commercial space on the ground floor;
  • A floor space ratio (FSR) of 16.1; and
  • A building height of 105.5 m (364 ft.) with additional height for rooftop amenity space.

This application is being considered under the Downtown Eastside Plan. The application requests consideration of height and density in excess of the existing policy.

This application is being processed and reviewed concurrently with the application to rezone 1115-1127 E Hastings St and 1168-1180 E Hastings St.

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The City of Vancouver has received an application to rezone the subject site from M-1 (Industrial) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 38-storey mixed-use building and includes:

  • 382 rental residential units;
  • Commercial space on the ground floor;
  • A floor space ratio (FSR) of 16.1; and
  • A building height of 105.5 m (364 ft.) with additional height for rooftop amenity space.

This application is being considered under the Downtown Eastside Plan. The application requests consideration of height and density in excess of the existing policy.

This application is being processed and reviewed concurrently with the application to rezone 1115-1127 E Hastings St and 1168-1180 E Hastings St.

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

Page last updated: 06 Nov 2024, 11:12 AM